Investment

Woking Town Centre Transport Infrastructure Package

Last updated 06 September 2019
bookmark Add to bookmarks
Woking Town Centre Transport

Project description

The package consists of a comprehensive group of schemes to improve accessibility and provide a vibrant town centre. The project will offer a more efficient, safe and pleasant environment for all users of Woking Railway Station by providing an excellent transport interchange between all modes. It will also provide improved cycling and walking facilities in the Town Centre and to facilitate the use of active transport and to ease congestion on the roads allowing for a more pleasant urban realm and increased business location in the town. The scheme is being delivered in 5 phases: Phase 1 (Goldsworth Road) As part of the Woking Fire Station development, adaptations to Goldsworth Road including a new box junction and reconfiguration of the junction with Victoria Way were completed in summer 2016. Phase 2 (High Street and Broadway) Various changes to the operation of the road network in this area including the creation of a new link road connecting High Street with Victoria Way. The works also include the relocation of the taxi rank, improved bus facilities, wider pavements and dedicated cycle lane, to improve pedestrian and cycle connectivity. Phase 3 (Victoria Way) Victoria Way will be adapted to incorporate a bus lane and a new bus stop will be built by The Lightbox Museum and Gallery. Phase 4 (Church Street West junction) Improvement work to the junction of Victoria Way and Church Street West. Phase 5 (Victoria Way) The final phase of highway improvements will connect the previous four phases and facilitate any future replacement of Victoria Arch by Network Rail

Project output

The outputs that will be unlocked by the Town Centre Transport Infrastructure Package are:

  • Increased investment in the Town Centre as a result of enhanced transport infrastructure capability (permitted developments).
  • Increased investment in the Town Centre as a result of enhanced transport infrastructure capability (completed developments).
  • New Grade A office space available in the Town Centre.
  • Increased residential dwellings (Class C) in the Town Centre.
  • Increased retail space (Class A) available in the Town Centre.
  • Increased usage of Woking Train station.
  • Improved Town Centre Public Realm.
  • Overall completion works within time, budget and to the desired standard.
  • Increase to the overall quality and quantity of the retail, catering and leisure offer in Woking Town Centre.
  • Increase to Woking’s Residential Comparison Goods Market.
  • Increase to the number of jobs created in the Borough.
  • Increased hotel provision in Woking Town Centre.

Key Outputs

Start date:

End date:

Amount financed: £11million

Total cost: £25.6 million

Status: In progress

Project Lead: Kevin Travers

Themes: Places

Geo-location: